Wudongde Dam

The Wudongde Dam (Chinese:乌东德大坝) Hydropower Station is located at the junction of Sichuan and Yunnan provinces in southwestern China. With a total installed capacity of 10,200 MW, it is one of the four power stations planned for China’s Jinsha River Hydropower Station. It is also the first hydropower station on the Jinsha River from upstream to downstream.

Wudongde Dam Hydropower Station has a total cost about 120 billion yuan (US $16.9 billion).

Wudongde Dam opend in Jun-29, 2020
Wudongde Dam opend in Jun-29, 2020

Wudongde Dam is a concrete double-curvature arch dam, with a crest elevation of 988 meters, a maximum dam height of 270 meters, a bottom thickness of 51 meters, and a thickness-to-height ratio of only 0.19.

It is the world’s thinnest 300-meter super high arch dam and the first in the world. The entire dam is a super high arch dam constructed with low-heat cement concrete.

On December 24, 2015, the Wudongde Hydropower Station was fully started. On March 16, 2017, the dam concrete of Wudongde Hydropower Station was opened and poured.

On June 29, 2020, the Wudongde Hydropower Station’s first units were officially put into operation for power generation.

Wudongde Dam under construction
Wudongde Dam under construction

History

  • In the 1950s:the Wudongde Dam Hydropower Station began preliminary exploration work.
  • 2002: the development right of the Wudongde Hydropower Station was clearly vested in the Three Gorges Group. Subsequently, the Three Gorges Group organized the pre-feasibility survey and design work.
  • In 2010: the pre-feasibility study report of Wudongde Hydropower Station passed the review. The National Development and Reform Commission of China agreed to carry out power station construction’s preliminary work.
  • On December 24, 2015: the construction of the Wudongde Dam Hydropower Station began.
  • On March 16, 2017: the dam concrete of Wudongde Hydropower Station was opened and poured.
  • On December 18, 2019: the installation of Unit 6 of the second unit of Wudongde Hydropower Station and the first unit on the left bank was completed.
  • On February 16, 2020: 4 units of Wudongde Hydropower Station have been installed. On May 6, the Wudongde Hydropower Project’s second stage on the Jinsha River was impounded to 945 meters and passed the acceptance.
  • On June 29, 2020: the first two 850,000-kilowatt units of Wudongde Hydropower Station were officially put into operation.
Wudongde Hydropower Station Unit 7 was successfully installed
Wudongde Hydropower Station Unit 7 was successfully installed

Hydroelectric dam

The Wudongde Hydropower Project is a large-scale project of Class I in China. The main building comprises water retaining structures, water discharge structures, and water diversion and power generation structures.

The bottom of the Wudongde dam is 51 meters thick, with a thickness-to-height ratio of only 0.19. It is currently the world’s thinnest 300-meter arch dam. The structure is complex, the engineering importance is high, and the concrete pouring quality is high.

The dam is a concrete double-curved arch dam with a crest elevation of 988m and a maximum dam height of 270m.

Wudongde Dam before impoundment
Wudongde Dam before impoundment

The dam’s peak annual concrete pouring strength can reach 951,000 cubic meters, and the highest monthly pouring strength is about 100,000 cubic meters. The concrete pouring strength is high.

The flood discharge adopts the dam body as the main flood discharge method, and the shore flood discharge tunnel is the supplementary method.

The powerhouses are arranged in the mountains on the left and right banks, both on the riverbed side. Each is installed with 6 Francis turbine generators with a single unit capacity of 850MW, with a total installed capacity of 10,200 MW.

Wudongde Dam under construction at night
Wudongde Dam under construction at night

Smart dam

The Wudongde Hydropower Station Dam is a new type of dam using smart technology. Many new technologies were used in the construction process, including dam intelligent construction systems throughout the life cycle.

The concrete used in dam construction is uniformly arranged and produced by an intelligent system, including concrete manufacturing, transportation, distribution, grouting pressure, flow control, data recording, and processing.

Wudongde Hydropower Station
Overview of Wudongde Hydropower Station under construction

All data in the project are collected in real-time, processed in the background, planned uniformly, and controlled in advance.

The dam body is also equipped with measurement and control equipment, and the overall status of the dam is also monitored and controlled by the intelligent system in real-time.

The technology of this dam represents the highest level of intelligent engineering technology in China.

Wudongde Hydropower Station under construction
Wudongde Hydropower Station under construction

Wudongde Dam Data

Country
China
Region
East Asia
Status
In use
Official name
乌东德大坝
Other name(s)
乌东德水电站
Location
Between Sichuan and Yunnan, China
Operator(s)
China Three Gorges Corporation
Purpose
Power, flood control, navigation, Drought resistance
Cost
120 billion yuan (US $16.9 billion)
Began
Dec-24, 2015
Construction end
Feb-16, 2020
Opened
Jun-29, 2020
Total Duration
5
Building height
886 ft (270 m )
Total Length
1072 ft (326.9 m )
Installed capacity
10200
Turbines
12 × 850 MW Francis-type
River
Jinsha River
Total capacity
7,600,000,000 m³
Reservoi Surface elevation
3199 ft (975 m )

Wudongde Dam Location On Earth

Filter by
View Wudongde Dam on Google Satellite Map

Google satellite maps allow you to see building details more clearly, including natural landscapes such as mountains, rivers, deserts, sea and man-made engineering buildings.

If you are very interested in this engineering building, it is a good idea to click below Google Map icon. We will help you jump to the corresponding location of this building or engineering on Google satellite map.

Go to Google Satellite Map
View Wudongde Dam on 720yun

720yun is a panoramic image service provider, where you can see the panoramic image of the Engineering Building, let you know more about the Engineering Building.

720yun
REVIEW OVERVIEW
Scale ( only within the industry of this building / engineering )
8.9
Technology ( only within the industry of this building / engineering )
9.2
Cost ( only within the industry of this building / engineering )
8.5
Era-2015 ( The earlier the era, the higher the score,respect the older generation of engineering )
6.2

LEAVE A REPLY

Please enter your comment!
Please enter your name here