King Fahd Causeway

The 25km-long King Fahd causeway(Arabic:جسر الملك فهد) links the Kingdom of Bahrain with the Eastern region of the Kingdom of Saudi Arabia,It is located on the Gulf of Bahrain in the Red Sea.

Its total length is 25 km (16 mi) and the length of the bridge section is 12.4 km (7.7 mi).
The total cost is US $ 800 million.

Crossing the Gulf of Bahrain, in the Persian Gulf, the causeway starts in Saudi Arabia at Al-Aziziyyah, south of Alkhobar, and extends up to Al-Jasra, west of Manama in Bahrain.
It comprises two segments, a longer bridge from Khobar to Nasan Island in Bahrain and a shorter stretch from Nasan Island to the main island of Bahrain.

Overview of King Fahd Causeway
Overview of King Fahd Causeway

The $800m project was officially launched to public in 1986. On an average, it serves about 45,000 vehicles a day that increases to about 60,000 vehicles during weekends. It was used by 17.7 million passengers in 2008.

The causeway was built by Dutch contractor Ballast Nedam and financed entirely by the Kingdom of Saudi Arabia and King Fahd Causeway Authority (KFCA) is the operator.

A $5m expansion to the causeway was announced in July 2010. The expansion aims to increase the departure and arrival lanes on both sides of the causeway.

View King Fahd Causeway from Middle island
View King Fahd Causeway from Middle island

King Fahd causeway design

The total length of King Fahd causeway is 25 km (16 mi).

The causeway is a four-lane road featuring two roadways. Each roadway is 11.6m wide and includes two lanes running in opposite directions. It features a curb for emergency parking.

There are five bridges, totalling 12.43km in length, along the route of the entire causeway. The first three bridges measure 934m, 2,034m and 5,194m in length and form part of the Saudi side. The Bahraini side of the causeway contains two bridges measuring 3,334m and 934m in length. The bridges are interconnected by islands and dams. Approximately 12.5km of the causeway has been constructed as a dam.

King-Fahd Causeway
King-Fahd Causeway

The causeway also comprises seven embankments extending 12.57km in length. A 660,000m² border station at embankment no. 4 is the largest among all. Designed as two connected islands, the border station includes two mosques, two 65m high tower restaurants, buildings of KFCA and other government directorates and two coastguard towers.

The island on the west side is designated to Saudi Arabia while that on the east side is designated to Bahrain.

Satellite map of King Fahd Causeway
Satellite map of King Fahd Causeway

What’s the Difference between a bridge and a causeway?

A Bridge is a structure which allows passage over some type of impediment to travel (such as a roadway over a river, or other body of water).

King Fahd Causeway
As you can see in this picture, the end of the bridge is the causeway


Causeways tend to refer to roadways which are close to the surface of the water or wetlands they provide passage over, and often do not allow nautical navigation underneath them.

Expansion

The expansion project is part of a larger SAR1.07bn ($284.8m) causeway development project plan that aims to increase the number of lanes dramatically. The project will involve the construction of two 400,000m² artificial islands, one on either side of the causeway.

Approximately SAR998m will be used for the construction of the islands, associated infrastructure, buildings and other facilities. A waiting yard with a capacity for 400 trucks will also be constructed at either end of the causeway.

The expansion will add seven new departure lanes and five new arrival lanes, bringing the total number of departure and arrival lanes to 17 and 18 respectively. A new commercial centre is currently being renovated on the Bahraini side. The centre will include a number of restaurants, coffee shops, a grocery shop, telephone stalls and a shop for the travelers to meet. It is scheduled completion by 2011.

A bridge in the King Fahd Causeway
A bridge in the King Fahd Causeway

A health centre to accommodate an emergency room and an ambulance is also under construction on the Bahrain side. A similar health centre will be constructed on the Saudi side.

At the Bahraini entrance, a security checkpoint will be installed. Utilities including washrooms and mosques will also be expanded on both sides of the causeway as part of the project.

The expansion will increase the passenger handling capacity of the causeway to 100 million a year. The construction is expected to begin in 2012 with scheduled completion by December 2015.

Construction

The causeway was constructed between 1982 and 1986. It involved the installation of over 500 pre-stressed concrete cylinder piles beneath and along the causeway. The piles are 3.5m in diameter and have been installed and grouted into drilled sockets. In order to suit the geotechnical conditions, the length of the piles was changed from bent to bent.

Approximately 350,000m² of concrete was used along with 47,000t of reinforced steel. To avoid corrosion of the reinforced steel a blend of blast furnace, slag and portland cement was used. A low water to cement ratio was obtained using a high-range water reducing admixture. In the splash zone, the piles were coated with epoxy.

The dam construction involved use of five million tons of rock and broken stone and approximately ten million cubic feet of sand, extracted from the seabed.

King Fahd Causeway schematic
King Fahd Causeway schematic

King Fahd Causeway Data

Country
Saudi Arabia/Bahrain
Location
Between al-Khour neighbourhood of Khobar, Saudi Arabia and Al Jasra, Bahrain.
Official name
جسر الملك فهد
Other name
Bahrain Bridge
Cost
US $800 million
Status
In use
Maintained by
King Fahd Causeway Authority
Constructed by
Ballast Nedam
Began
Nov-11, 1982
Construction end
Apr-11, 1985
Opened
Nov-26, 1986
Total Duration
3 years
Length
25 km (16 mi)
Bridge section length
12.4 km (7.7 mi)
Width
23 m (75 ft)
Design type
Causeway and bridge
Bridge type
Cross sea bridge
Crosses
Gulf of Bahrain(On Red Sea)
Road scale
4 lanes
Toll
SAR 25, BHD 2.5 (Small Vehicles) SAR 35, BHD 3.5 (Light Trucks Small Bus) SAR 50, BHD 5 (Large Buses) SAR 5, BHD 0.500 per ton (Trucks)

King Fahd Causeway Location On Earth

Filter by
View King Fahd Causeway on Google Satellite Map

Google satellite maps allow you to see building details more clearly, including natural landscapes such as mountains, rivers, deserts, sea and man-made engineering buildings.

If you are very interested in this engineering building, it is a good idea to click below Google Map icon. We will help you jump to the corresponding location of this building or engineering on Google satellite map.

Go to Google Satellite Map
REVIEW OVERVIEW
Scale ( only within the industry of this building / engineering )
7.5
Technology ( only within the industry of this building / engineering )
6.2
Cost ( only within the industry of this building / engineering )
5
Era-1982 -1982 ( The earlier the era, the higher the score,respect the older generation of engineering )
7.7

1 COMMENT

  1. This is a great article thanks for sharing this informative information. I will visit your blog regularly for the latest post. Bahrain to Cuaseway

LEAVE A REPLY

Please enter your comment!
Please enter your name here